Shift Rotation Schedules
DuPont
28-day cycle with a signature 7-day break every 4 weeks, at the cost of a 4-night block.
Panama (2-2-3)
14-day 2-2-3 cycle, never more than three shifts in a row, every other weekend fully off if it starts on the right weekday.
Pitman (EOWEO)
The same 2-2-3 cycle as Panama, pinned to the calendar week so every other Saturday+Sunday is off together.
4-on-4-off
The simplest pattern to remember, but it drifts through the week — 56 days (fixed) before shifts land on the same weekday again.
Every rotation on this page does the same job: keep a post staffed 24 hours a day, 7 days a week, with four crews on 12-hour shifts. One day crew and one night crew are on at any moment, and the other two are off. That works out to 168 hours of coverage a week (24 × 7) shared by four crews, so each crew averages exactly 42 hours a week whichever pattern you pick. The hours are the same in all of them; what differs is how many shifts you work in a row, how long the breaks are, how nights are shared, and how many weekends you get.
The table below puts the patterns side by side. Every figure in it is computed from the same pattern data the generators use, so it matches the calendars you download. Click a rotation name to open its generator, pick a start date and crew names, and export the calendar to Excel.
The rotations side by side
| Rotation | Crews | Shift | Cycle (days) | Avg hours / week | Longest stretch on | Longest stretch off | Full weekends off per cycle | Same weekdays again after (days) |
|---|---|---|---|---|---|---|---|---|
| DuPont | 4 | 12 h | 28 | 42 | 4 | 7 | 1.4 of 4.0 | 28 |
| Panama (2-2-3) fixed crews | 4 | 12 h | 14 | 42 | 3 | 3 | 0.6 of 2.0 | 14 |
| Panama (2-2-3) rotating crews | 4 | 12 h | 28 | 42 | 3 | 3 | 1.1 of 4.0 | 28 |
| Pitman (EOWEO) | 4 | 12 h | 14 | 42 | 3 | 3 | 1.0 of 2.0 | 14 |
| 4-on-4-off fixed crews | 4 | 12 h | 8 | 42 | 4 | 4 | 0.4 of 1.1 | 56 |
| 4-on-4-off rotating crews | 4 | 12 h | 16 | 42 | 4 | 4 | 0.9 of 2.3 | 112 |
Stretches count consecutive shifts (day or night) and consecutive days off. Weekends are full Saturday-and-Sunday pairs off, averaged over the four crews and over every possible start weekday; the second number is how many weekends fall in one cycle. Pitman is pinned to Monday, so its figure does not depend on the start date.
Which one fits
None of these is better in general. Each one trades something for something else, and the right choice depends on what your people complain about most.
- DuPont has a 28-day cycle and one 7-day break in every cycle. The price is a block of 4 nights in a row, and a cycle that is hard to hold in your head without the calendar. It suits sites where people value a long block off and the four-night run is acceptable. If DuPont is already in your agreement, this generator gives you the calendar for it.
- Panama (2-2-3) never asks for more than 3 shifts in a row and never gives more than 3 days off in a row, so nobody is away from work or stuck on a long run for very long. With fixed crews, two crews work days and two work nights permanently; with rotating crews, everyone shares the nights over a 28-day cycle. Weekends are where it is weakest: on average a crew gets 0.6 full weekends off per 14-day cycle with fixed crews and 1.1 per 28 days with rotating crews, and which crews get them depends on the start date you pick.
- Pitman (EOWEO) is the same 2-2-3 cycle pinned to the calendar week, so every crew gets every other Saturday and Sunday off together (1 per 14 days, guaranteed rather than dependent on the start date). If weekends off is the main thing your people want and short blocks suit you, this is the one to look at. The generator here has fixed crews only, so two crews are on nights permanently.
- 4-on-4-off is the easiest to explain and remember: work four, off four. The catch is that the 8-day cycle does not line up with the 7-day week, so shifts drift across the weekdays and a crew gets only 0.4 full weekends off per cycle with fixed crews (0.9 per 16-day cycle when rotating). The calendar only repeats on the same weekdays after 56 days (fixed) or 112 days (rotating). It also means up to 4 nights in a row. It suits small teams that want a pattern everyone can recite.
Fixed or rotating crews? With fixed crews, each person stays on days or on nights, which is easier on body clocks, but the night crews are permanently on nights. With rotating crews the nights are shared evenly and nobody is stuck on them, but everybody switches between days and nights every cycle. Where the generator offers both, you can switch between them on the rotation's page and compare the calendars.
When a fixed rotation is not enough
A rotation is a repeating pattern, and that is all it is. It puts exactly one day crew and one night crew on every day, forever. It does not know that one crew is short a nurse, that someone is on leave in week three, that Tuesday mornings need more people than Sunday nights, or that your agreement requires 11 hours of rest between shifts. The generators here only check coverage and that no crew goes straight from a night into a day shift. They do not enforce any other rest rule, and they do not pretend to.
When your rules are those kinds of rules, you are no longer picking a pattern, you are solving a scheduling problem. The 24/7 shift schedule optimizer takes your people, their skills, availability, minimum rest, limits on consecutive days and nights, and how many people each shift needs, and returns a roster that meets the hard rules or tells you which posts it could not fill. It is free and uses a real solver, not a pattern.
More on each pattern
The generators above give you the calendars. These longer guides on the blog explain how each pattern works and where it goes wrong:
- The DuPont schedule explained, with the full 28-day cycle
- The 2-2-3 schedule, including the Panama variant
- The Pitman schedule and what makes it different from 2-2-3
- The 4-on-4-off schedule and its weekday drift
- Rotating shift schedules in general, and how to choose between them